Index of /canoe/canoeCD/construction

[ICO]NameLast modifiedSizeDescription

[DIR]Parent Directory  -
[IMG]Ali patching gunnel.jpg25-May-1999 18:48 35K
[IMG]Dan assembling reinforcement.jpg25-May-1999 18:48 28K
[IMG]Dan patching inside.jpg25-May-1999 18:48 28K
[IMG]Dan pinning the mesh down.jpg25-May-1999 18:48 24K
[IMG]Dave, Dan and Paras chillin on the mold.jpg25-May-1999 18:48 45K
[IMG]Dave and Felske taking pride in quality work.jpg25-May-1999 18:48 72K
[IMG]Dave measuring super.jpg25-May-1999 18:48 32K
[IMG]Dave sanding bulkhead.jpg25-May-1999 18:48 29K
[IMG]Dirk mixing.jpg25-May-1999 18:48 39K
[IMG]Felske the Assasin.jpg25-May-1999 18:48 83K
[IMG]Hobart mixer.jpg25-May-1999 18:48 31K
[IMG]Holly and Martha drawing baselines for bulkheads.jpg25-May-1999 18:48 35K
[IMG]Holly drilling a guide hole.jpg25-May-1999 18:48 39K
[IMG]Holly with the hotwire.jpg25-May-1999 18:48 20K
[IMG]Keep Out - Construction Area.jpg25-May-1999 18:48 37K
[IMG]Markam attaching saw horses to stretcher.jpg25-May-1999 18:48 41K
[IMG]Markam at the bandsaw.jpg25-May-1999 18:48 36K
[IMG]Paras, Holly and Martha placing concrete.jpg25-May-1999 18:48 34K
[IMG]Paras and Dan painting outside.jpg25-May-1999 18:48 34K
[IMG]Paras and Dan preping the reinforcment.jpg25-May-1999 18:48 35K
[IMG]Paras and Markam assembling the stretcher.jpg25-May-1999 18:48 25K
[IMG]Paras and Troy shrinking plastic.jpg25-May-1999 18:48 38K
[IMG]Paras with stickman.jpg25-May-1999 18:48 36K
[IMG]Troy Mixing.jpg25-May-1999 18:48 37K
[IMG]Troy patching hull.jpg25-May-1999 18:48 23K
[IMG]Troy sanding keel.jpg25-May-1999 18:48 24K
[IMG]adding a baseline to the bulkheads.jpg25-May-1999 18:48 59K
[IMG]after first pass of patch.jpg25-May-1999 18:48 23K
[IMG]apprasing the finished mold.jpg25-May-1999 18:48 35K
[IMG]canoe on the floor but still in mold.jpg25-May-1999 18:48 32K
[IMG]chopping foam.jpg25-May-1999 18:48 31K
[IMG]cutting out a bulkhead.jpg25-May-1999 18:48 83K
[IMG]early patching.jpg25-May-1999 18:48 36K
[IMG]early patching2.jpg25-May-1999 18:48 32K
[IMG]finished mold without shrink wrap.jpg25-May-1999 18:48 44K
[IMG]holding the sides in with big blocks.jpg25-May-1999 18:48 28K
[IMG]lifting canoe off saw horses.jpg25-May-1999 18:48 31K
[IMG]measurin tool.jpg25-May-1999 18:48 23K
[IMG]mold with gunnels.jpg25-May-1999 18:48 34K
[IMG]petting the canoe.jpg25-May-1999 18:48 36K
[IMG]placing concrete.jpg25-May-1999 18:48 33K
[IMG]placing concrete2.jpg25-May-1999 18:48 39K
[IMG]pushing edges down.jpg25-May-1999 18:48 36K
[IMG]re-bar in rib.jpg25-May-1999 18:48 26K
[IMG]ready to lift the canoe off the mold.jpg25-May-1999 18:48 33K
[IMG]red paint.jpg25-May-1999 18:48 29K
[IMG]red paint2.jpg25-May-1999 18:48 30K
[IMG]red paint3.jpg25-May-1999 18:48 36K
[IMG]red paint inside unsanded.jpg25-May-1999 18:48 22K
[IMG]rolling the canoe.jpg25-May-1999 18:48 30K
[IMG]shaving foam2.jpg25-May-1999 18:48 46K
[IMG]shaving foam3.jpg25-May-1999 18:48 47K
[IMG]shaving foam4.jpg25-May-1999 18:48 47K
[IMG]shhhh the canoe is sleeping.jpg25-May-1999 18:48 22K
[IMG]shrink-wrapped mold.jpg25-May-1999 18:48 30K
[IMG]stickman at the bow.jpg25-May-1999 18:48 38K

Apache/2.2.0 (Fedora) Server at nand.net Port 80